Starter Vape Kit MVO — timeline
This page is for smoke shop owners who want a working answer on specification, price and lead time before they commit a purchase order. We have written the detail down so nobody has to sit through a sales call to extract it.
Published 25 September 2026 · VapeWholesaleHub · Reading time 7 min
Keeping the second shipment identical
Starter Vape Kit is a specification decision before it is a price decision. Get the resistance, the capacity and the packaging right and the price conversation becomes short. Get them wrong and no discount will rescue the order.
The replacement policy is deliberately simple: report within seven days of delivery with photos and the batch code, and we replace or credit at the next shipment. We do not argue about a defect we can see in a photograph.
For private label accounts we hold the artwork files and the approval record. Rebranding a line eighteen months later is then a file update instead of a redesign.
Where the margin really sits
Payment terms for new accounts are normally a deposit with the balance against the bill of lading. Established buyers on a repeat schedule can move to terms after three clean shipments.
A landed cost sheet for starter vape kit has five lines: unit price, packaging, freight, duty and the cost of defects. Quoting only the first line is how buyers end up surprised at the fourth.
What we test before a carton is sealed
Leak complaints almost always trace back to one of three things: an over-torqued centre post, a seal that sat in a hot container, or a fill volume pushed past the design limit. We cap fill volume slightly below maximum for exactly that reason.
Every batch is pulled from running production, not from a display shelf. We check draw resistance, airflow balance, charge behaviour, leak performance after a temperature shift, finish quality and carton integrity, and we keep the pull records against the order number.
- Consolidated or split shipping, quoted both ways
- Artwork proof plus physical dummy for custom packaging
- Reference sample retained from every batch
- Specification locked in writing before production starts
- Mixed SKU cartons to spread first-order risk
- Seven-day defect reporting with replace-or-credit
Sell-through notes for the shop floor
Counter space is finite. Three well-chosen SKUs outsell nine crowded ones, and the empty space signals a curated range rather than a clearance table.
Bundle a device with a consumable and the reorder rhythm changes from occasional to weekly. That single merchandising decision often does more for monthly revenue than a price promotion.
Specification summary
| Battery | 800 mAh |
| Pod capacity | 3.0 ml |
| Coil resistance | 1.2 ohm |
| Included | Device, 2 pods, cable |
| Charging | USB-C 5V/1A |
| Packaging | Blister pack |
| Minimum order | 300 units per SKU, mixed cartons allowed |
| Lead time | 12 working days after artwork approval |
The detail above is what we hold ourselves to on every shipment, including the small ones. It is also the list we will walk through with you before the first order.
Frequently asked
What happens if part of the order is defective?
Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.
Can you ship to multiple locations?
Yes. Split shipments are quoted separately because consolidation and splitting price differently. Tell us the destination list at quotation stage and we will show both options.
How long does production take?
Around 30 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
Related reading
Need a quotation on starter vape kits?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz